Move building materials, pallets, components, and equipment across changing job-site conditions and deliver loads to the required working position with material handling equipment configured around the load, terrain, lift height, forward reach, and site layout.
Move Materials from Site Entry to the Working Position
Construction-site handling should be planned around the complete route from unloading to final placement. HULKMAN equipment can be configured for ground-level transport, rough-surface travel, elevated placement, extended reach, and different load interfaces according to the project.
-
Receiving & Unloading
Unload pallets, building materials, components, and equipment from trucks and transfer them to temporary staging or storage areas.
-
Site Material Transport
Move materials between storage areas, work zones, buildings, and construction points across the actual site route.
-
Elevated Material Delivery
Lift materials to elevated platforms, upper-floor work areas, or other positions where greater vertical reach is required.
-
Forward-Reach Placement
Position loads across obstacles or into working areas where the vehicle cannot move directly beneath the delivery point.